Design & construction holding · Kazakhstan

Engineering at industrial scale

Design, construction and service of mining, metallurgical and power facilities — turnkey, since 2001.

Start a project

49.97° N · 82.61° E — Ust-Kamenogorsk

24+years in the industry
600+employees
120+projects delivered
Scroll down

We build what Kazakhstan's industry stands on: processing plants, mine ventilation complexes, power facilities. From the first line of the drawing — to commissioning under load.

24+ years in the industry
600+ employees
120+ projects delivered
7200 m2 production facilities
3000 m2 warehouse facilities

One delivery chain

From source data to stable operation

Six stages inside one group. The project does not get lost between contractors: accountability, documentation and technical decisions move through one engineering chain.

  1. 01

    Survey

    We gather source data and assess the site, process, constraints and actual condition of the equipment.

  2. 02

    Engineering

    We develop the technical solution, BIM model, estimates and detailed documentation, including expertise support.

  3. 03

    Procurement

    We select equipment and materials, coordinate manufacturers and manage delivery schedules.

  4. 04

    Manufacturing

    We produce steel structures, control cabinets and process assemblies at our own facilities.

  5. 05

    Construction and installation

    We deliver civil works and install equipment, utilities and automation systems.

  6. 06

    Commissioning and service

    We commission under load, train personnel and remain available for planned and emergency maintenance.

Full cycle, in-house

Eleven service lines, four engineering divisions. General contracting without subcontractor risk: a design institute, construction units, service crews and a production base — all inside the holding.

01

Design & Engineering

A Category 1 licensed design institute: from feasibility studies and BIM models to detailed documentation and authorship supervision. Specialization — solid minerals extraction and processing, metallurgy, power.

  • Design of any degree of complexity
  • BIM design and authorship supervision
  • Exploration and drilling-blasting operations
Software: Civil 3D, Surpac, Deswik, Navisworks Explore the service →
02

Construction & Mining

Industrial and civil construction of any complexity, open-pit mining under general contract: from site preparation to state commissioning.

  • Industrial and civil construction
  • Mining operations and quarry general contracting
  • Steel structures, lining and refractory works
Category 1 construction license · Class 1 mining license Explore the service →
03

Automation & Power

Turnkey process control (SCADA) and power supply systems: design, installation, commissioning and service. A joint assembly shop with Schneider Electric in Ust-Kamenogorsk — the only authorized Altivar Process manufacturer in Kazakhstan.

  • Implementation and service of automation and power systems
  • Repair of electrical equipment and machines
  • Accredited electro-technical laboratory
900+ electric machines restored Explore the service →
04

Service & Supply

Repair and maintenance of mining and process equipment, mill re-lining, planned-maintenance outsourcing with in-house crews, supply of industrial equipment from global vendors.

  • Re-lining of ball and SAG mills
  • Repair of mining and process equipment
  • Maintenance outsourcing and equipment supply
Ongoing contracts: KAZ Minerals, Kazzinc, Solidcore Explore the service →
Explore all capabilities

Flagship projects

Backbone facilities of the mining and power industries of Kazakhstan and the CIS.

Projects →

Faster than the contract

Mill re-lining and equipment service — work where every hour of plant downtime costs the client money. Our track record: contract schedule versus actual delivery.

Planned Actual
KAZ Minerals · Orlovsky plant MMC 7.0×2.3 mill body assembly
60 days
36 days
Udokan · Thyssenkrupp crushers KB-63-895 liner replacement
94 hours
72 hours
Kazzinc · Zhairem MSHTS mill re-lining
72 hours
48 hours
Solidcore · Bakyrchik Ball mill re-lining
60 hours
48 hours
Nordgold · FIK Alel Four mills re-lined simultaneously
28 days
24 days
RG Gold MSHTS mill array re-lining
72 hours
66 hours

That's

OstaraGroup.

Full cycle. Single-point responsibility.

Partners & clients

Partners & clients →

Official partnerships

Trusted by

What we stand on

About →

People

Decisions are made by those who answer for the result. Talent development, meritocracy and teamwork.

Reputation

Honest dealings with clients, partners and employees. Promises are kept — reputation is guarded.

Innovation

A constant search for new ideas and command of advanced technology — from BIM to bio-leaching.

Let's start working together

The holding's specialists will answer your questions and prepare an individual commercial proposal.

Next step

A technical consultation with the relevant team

Describe the task and choose a direction so the request reaches the right specialists without unnecessary handoffs.

What you get

  • Warranty across the full range of services
  • Category 1 licenses and ISO 9001/14001/45001
  • 7,200 m² production base and 3,000 m² of warehouses

Address 108/25 Tselinnaya St, Ust-Kamenogorsk, Republic of Kazakhstan

Phone 8 (7232) 49-27-20

Email info@ostara-group.com