Home·Flagship projects

Main mine ventilation units

Main mine ventilation units
400 m³/s
air flow capacity
2
mines, turnkey

Vostoktsvetmet · KAZ Minerals · 2021–2022

Turnkey construction of main ventilation units for the Orlovsky and Artemyevsky mines: TLT-Turbo centrifugal fans, air ducts, power supply and automation.

Sector
Underground mining
Location
Orlovsky and Artemyevsky mines, East Kazakhstan
Period
2021–2022

Scope of work

  • Installation of TLT-Turbo centrifugal fans
  • Construction of air ducts and engineering structures
  • Power supply, automation and commissioning

Result

Two mines received operational ventilation complexes delivering up to 400 m³/s, with power supply and control integrated into a single system.