Main mine ventilation units
- 400 m³/s
- air flow capacity
- 2
- mines, turnkey
Vostoktsvetmet · KAZ Minerals · 2021–2022
Turnkey construction of main ventilation units for the Orlovsky and Artemyevsky mines: TLT-Turbo centrifugal fans, air ducts, power supply and automation.
- Sector
- Underground mining
- Location
- Orlovsky and Artemyevsky mines, East Kazakhstan
- Period
- 2021–2022
Scope of work
- Installation of TLT-Turbo centrifugal fans
- Construction of air ducts and engineering structures
- Power supply, automation and commissioning
Result
Two mines received operational ventilation complexes delivering up to 400 m³/s, with power supply and control integrated into a single system.