Home·Flagship projects
Flagship projects
Backbone facilities of the mining and power industries of Kazakhstan and the CIS.
Bio-leaching: doubling plant capacity
Expansion of oxide ore production with a bio-oxidation system — the first project of this scale in Kazakhstan. A 3,000 m³ inoculation pond, process tanks, bio-oxidation lines.
- 25 → 50
- million tons of ore per year
- 3,000 m³
- inoculation pond
- #1
- in Kazakhstan
Main mine ventilation units
Turnkey construction of main ventilation units for the Orlovsky and Artemyevsky mines: TLT-Turbo centrifugal fans, air ducts, power supply and automation.
- 400 m³/s
- air flow capacity
- 2
- mines, turnkey
Mine air heating station
A thermal plant of three modular air-heating units: air supplied down the shaft at a constant +2 °C through the harshest East Kazakhstan winters.
- 22.5 MW
- thermal output
- +2 °C
- all year round
AI Semey School-Lyceum No. 50 for 1,200 students
A multi-level educational complex measuring approximately 98 × 96 m: four functional blocks, a shared school centre, assembly and sports halls, an accessible environment and complete landscaping.
- 1,200
- students
- 4
- building blocks
- 98 × 96 m
- complex footprint